RollSeal Installation

Walk-in cooler and freezer doors can be installed IN LESS THAN 60 MINUTES.

Larger doors may require more time and the use of lifts to install the door.

STEP 1 - Placement

Slide tracks into header, bolt in place, plug in safety beam connectors.

STEP 2 - Stand Up & Mount

Stand up in opening, square tracks to header and attach to wall and floor with appropriate fasteners.

STEP 3 - Electrical

Mount controller, plug in motor and signal connectors, wire to local power (by a licensed electrician) and run set-up program.

ROLLSEAL FEATURES:

• Patented Technology
• Impact Resistant 
• Reduces Operational Footprint
• New Construction or Retro-Fit

ROLLSEAL TECHNOLOGIES:

• 3-Layers of Fabric Creating Space
Between Environments.
• Continuous Seals on Both Sides of Door, Front and Back Panels.

CUSTOM SIZES AVAILABLE:

Custom Sizes
Custom sizes up to 24′ x 24′

Custom Speeds
Custom speeds up to 48” per second

EASY SETUP & INSTALL:

STEP 1 – Placement
STEP 2 – Stand Up & Mount
STEP 3 – Electrical
Ready to Use!

Top